Blog Pages

Saturday, 31 August 2013

Barge Move - Inchinnan Bascule Bridge


This morning we witnessed another section bound for the wind farms.

The section was loaded on to a barge and the tugs 'Biter' and 'Beaver Bay' assisted in the move as it progressed down the River Cart and underneath the Inchinnan Bascule Bridge, and then on down to the River Clyde.

The tow will be taken over by another tug - the 'Osprey Fighter' - for the long sail round to Methil in Fife.


Barge and Load Approach the Inchinnan Bascule Bridge


Barge Passes Under the Inchinnan Bascule Bridge


 Barge and Load Pass Under the Bridge


'Biter' Assists the Barge and Load Pass Under the Bridge

Barge and Load Pass Under the Bridge 

 The Wind Farm Structure Heads to the Clyde


A Tight Squeeze at the Inchinnan Bascule Bridge

'Beaver Bay' Assists the Move

'Beaver Bay' Assists the Move

Nervous Moments as Barge Inches Past the Inchinnan Bascule Bridge

'Beaver Bay' Assists the Move

More images are available at - www.dougie-coull-photography.co.uk - better resolution and options to licence.

No comments:

Post a Comment