Showing posts with label Glasgow. Show all posts
Showing posts with label Glasgow. Show all posts

Sunday, 21 August 2016

HMS Forth - Heads to Fitting Out After Launch


The (HMS) Forth departed the KGV docks today having been floated off the barge yesterday.

She was towed to Yarrow's dock and will be there for around seven months while she is fitted out.

She will then begin sea trials.


First Taste of the River


Making Her Way Downriver


Tugs Escorting

Passing Braehead


On Her Way

Pilot and Yard Workers

 Entering Yarrow's Dock

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.

Friday, 19 August 2016

HMS Forth Departs Govan


The (HMS) Forth departed the BAE yard in Govan today and is now in KGV docks where she will be non-dynamically launched via the barge.

After the launch she will eventually be towed to Scotstoun for fitting out prior to sea trials.

 (HMS) Medway Under Construction

(HMS) Forth Awaits Her Departure


Awaiting Instructions


Bruiser Lining Up


 Helicopter Overflies the Scene

CMS Warrior Stands Off

 Activity Begins


Tugs Starting to Prepare for the Tow

Soon be on the Move 

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.

Monday, 2 May 2016

HMS Bulwark - Glasgow Departure


After her weekend berthed at the Shieldhall Quay in Glasgow HMS Bulwark departed this morning.

After the trip upriver in heavy rain it was with relief we finally got a break in the weather.

All went smoothly as she was taken off the wall and canted.

Off she went to sea for her next adventure.


Berthed at Shieldhall Quay


Taking the Ropes

 Svitzer Tugs Assisting

 A Busy Bridge

Canting Begins


 Taking the Strain

Communications on the Bridge


Passing Braehead

 Passing Rothesay Dock

Titan Crane in the Background


 Ropes Slipped

 Head On

Passing Bowling 

Passing Dumbarton

Heading Out to Sea

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.

Friday, 29 April 2016

HMS Bulwark - Glasgow Visit


HMS Bulwark is one of Royal Navy's Albion-Class assault ships and is designed to put Royal Marines ashore by both air and sea.

She celebrated her 11th Birthday yesterday, and arrived in the River Clyde this morning where she  travelled up to Glasgow.

She will be docked there over the weekend and depart on Monday.

A bitterly cold morning but worth the very early start to see her arrive.

She is an impressive looking vessel.

 Approaching Braehead


Passing Braehead

Landing Craft

Upper Decks

 Bound for Shieldhall Quay

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.

Thursday, 10 December 2015

Final Piece of the Jigsaw


The final piece of the aircraft carrier - (HMS) Prince of Wales - left Govan today and is now heading to Rosyth.

This is the Aft Island section.

Ayton Cross took the bow of the barge with CMS Warrior taking the stern.

The Esvagt Connector followed on and she took over the tow at Greenock to continue the journey.

I stopped off at Ferguson Marine where the new Calmac ferry will be launched tomorrow morning.


Passing Langbank


Approaching Port Glasgow


Sea Going Tug Esvagt Connector


Esvagt Connector


All the Tugs


Passing Port Glasgow


CMS Warrior


Heading Downriver


Bound for Greenock


Final Preparations for Tomorrow's Launch


Taking the Strain


Stern View


Heading to Sea

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.

Sunday, 15 November 2015

Wet Saturday Night and Sunday Morning


The dismal rainy weather continues and tonight seems worse than ever.

The plan is to get some images as Hawick Court in Greenock is demolished in the early hours of Sunday.

To keep active before then a trip across to Clydebank to see the Titan Crane - illuminated in the colours of the French flag to pay tribute to the victims of the Paris terror attacks.

Then on up to Glasgow and a whistle stop to grab an image of the SSE Hydro similarly illuminated.

With expectations that the demolition at Greenock may begin at 02:00 rather than the anticipated 02:30 it's a quick journey down.

If anything the rain is getting heavier and at this stage I'm questioning my sanity.

Arrived at Greenock having negotiated the start of flooding on the roads - a location is decided upon and I settle in for the wait.

The time comes and goes and eventually a very kind gentleman from the housing association comes to advise there is a delay of about 45 minutes as control of the railway line has just been secured.

After more time elapses and having all but given up, eventually the first siren sounds, followed by the second siren warning, before the final warning shot is fired.

Just after 04:00 the charges are fired and Hawick Court comes tumbling to the ground and all appears to have gone to plan.

Head home after negotiating the traffic control near Pottery Street as the road is now deeply flooded - felt like I was driving through a section of the Clyde.

Then on home for coffee and toast and a bit of editing before climbing in to bed just after 06:00 - been a long day.


SSE Hydro in Glasgow


Titan Crane in Clydebank


Tears from the Sky


Awaiting Detonation

 Starting to Collapse


 Continuing Downwards


 Almost Down


Now the Dust Settles

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.