Showing posts with label offshore. Show all posts
Showing posts with label offshore. Show all posts

Sunday, 21 August 2016

HMS Forth - Heads to Fitting Out After Launch


The (HMS) Forth departed the KGV docks today having been floated off the barge yesterday.

She was towed to Yarrow's dock and will be there for around seven months while she is fitted out.

She will then begin sea trials.


First Taste of the River


Making Her Way Downriver


Tugs Escorting

Passing Braehead


On Her Way

Pilot and Yard Workers

 Entering Yarrow's Dock

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.

Friday, 19 August 2016

HMS Forth Departs Govan


The (HMS) Forth departed the BAE yard in Govan today and is now in KGV docks where she will be non-dynamically launched via the barge.

After the launch she will eventually be towed to Scotstoun for fitting out prior to sea trials.

 (HMS) Medway Under Construction

(HMS) Forth Awaits Her Departure


Awaiting Instructions


Bruiser Lining Up


 Helicopter Overflies the Scene

CMS Warrior Stands Off

 Activity Begins


Tugs Starting to Prepare for the Tow

Soon be on the Move 

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.

Thursday, 10 December 2015

Final Piece of the Jigsaw


The final piece of the aircraft carrier - (HMS) Prince of Wales - left Govan today and is now heading to Rosyth.

This is the Aft Island section.

Ayton Cross took the bow of the barge with CMS Warrior taking the stern.

The Esvagt Connector followed on and she took over the tow at Greenock to continue the journey.

I stopped off at Ferguson Marine where the new Calmac ferry will be launched tomorrow morning.


Passing Langbank


Approaching Port Glasgow


Sea Going Tug Esvagt Connector


Esvagt Connector


All the Tugs


Passing Port Glasgow


CMS Warrior


Heading Downriver


Bound for Greenock


Final Preparations for Tomorrow's Launch


Taking the Strain


Stern View


Heading to Sea

More images are available at - www.dougie-coull-photography.com - better resolution and options to licence.

Tuesday, 10 September 2013

Bascule Bridge - Barge Move with Offshore Wind Turbine Assembly


Another section destined for Methil in Fife left the River Cart.

Interesting to see these various components pass down the river. This one weighs in the region of 500 tonnes.


Bascule Bridge Elevates


 'Biter' and 'Beaver Bay' Enroute to Collect Barge


'Beaver Bay' Enroute to Collect Barge


Barge Moving the Transition Piece for the Samsung 7 MW Offshore Wind Turbine


 Barge Moving the Transition Piece for the Samsung 7 MW Offshore Wind Turbine

 River Pilot Aboard the Barge

'Biter' and Barge Pass Beneath the Bascule Bridge

Safely Through the Gap

 'Beaver Bay' at the Barge Stern


Bascule Bridge Lowers to Allow Traffic to Resume


Bascule Bridge - Shipping Movements Video

More images are available at - www.dougie-coull-photography.co.uk - better resolution and options to licence.