Monday 30 April 2012

PS Waverley and Balmoral


The PS Waverley and the Balmoral left the Garvel Dry Dock having completed their external maintenance work.

They left later than expected in a biting cold wind and with the light fading.

PS Waverley went to Custom House Quay and Balmoral to the James Watt Dock.

Balmoral As The Dock as Flooded - Garvel Dry Dock

 PS Waverley and Beaver Bay - Garvel Dry Dock

PS Waverley with Biter and Beaver Bay - Garvel Dry Dock

Beaver Bay - Garvel Dry Dock

Biter - Garvel Dry Dock

 PS Waverley - Garvel Dry Dock

Balmoral - Entering James Watt Dock

Balmoral - Garvel Dry Dock
 
Balmoral - Entering James Watt Dock 

More images are available at - www.dougie-coull-photography.co.uk - and are also better resolution.